The 100 hub national rollout

Scaling from the Pune reference hub to one hundred accredited regional hubs across ten initial industrial clusters by December 2027

Target audience
State chief ministers, municipal development corporations, and national corporate sponsors
Primary sources
Invent in India national rollout blueprint 2026

The national expansion blueprint

The sovereign innovation deficit cannot be resolved from a single city or through centralized bureaucratic administration. True innovation is regional, emerging from specialized industrial clusters where universities, local industry, and creative talent converge.

The Invent in India blueprint establishes a disciplined three-phase expansion sequence designed to scale from one reference hub in Pune to one hundred accredited hubs across the nation by December 2027.

The ten candidate cities for phase one (first half of 2027)

Following the launch of the Pune innovation hub on 14 November 2026, the movement expands into ten candidate cities during the first half of 2027.

Bengaluru: aerospace, deep software, and small-satellite systems.

Hyderabad: biotechnology, pharmaceutical novel molecules, and defense avionics.

Chennai: electric mobility, automotive robotics, and marine engineering.

Mumbai: fintech, digital public infrastructure, and advanced materials.

Delhi national capital region: artificial intelligence governance, policy standards, and clean energy.

Ahmedabad: semiconductor packaging, solar manufacturing, and chemistry.

Kolkata: critical mineral extraction, rare earth processing, and mathematical computing.

Kochi: marine robotics, ocean energy, and maritime logistics.

Chandigarh: agricultural automation, cold-chain engineering, and biotechnology.

Bhubaneswar: metallurgy, heavy materials, and deep-ocean sensor networks.

The December 2027 global innovation summit

The national rollout culminates in the global innovation summit in December 2027. This summit will not feature multinational sales pitches or generic technology keynotes.

Instead, the summit will celebrate tangible invention: one hundred accredited hubs presenting their annual performance, domestic and international patents filed on the stage, commercial licensing agreements above one hundred crore rupees announced, and global laureates witnessing sovereign Indian innovation.

The three-phase rollout schedule for 100 accredited innovation hubs
Phase and timeframeTarget geographyOperational hub countKey deliverable
Phase 01: reference proof (q4 2026)Pune (c-dac reference laboratory)1 operational reference hubPune summit launch, Break It Challenge round 1
Phase 02: 10 industrial cities (h1 2027)Bengaluru, Hyderabad, Chennai, Mumbai, Delhi ncr, etc.10 regional hubs active10 specialized rigs deployed; corporate sponsors named
Phase 03: national scaling (h2 2027)Tier-1 and tier-2 university and industrial towns100 accredited hubs active100 hubs reporting on the yardstick at global summit
Culmination: December 2027Global innovation summit (Pune / new Delhi)100 reporting hubsPatents filed and mega-deals signed live on stage

Authentic research sources and citations

  1. Invent in India national steering committee. (2026). 100-hub accreditation charter and governance framework.
  2. NITI Aayog. (2025). State innovation index and regional industrial clustering analysis.